Mitsubishi Electric GOT2000 Series Connection Manual page 1163

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Step 9.
Return [Transfer Setup], click [Other Station (Single Network)], and double-click [CC IE Cont NET/10(H)].
Step 10.
Set as shown below and click [OK].
• When the GOT and PLC are on the same network
Select [Access to CC IE Cont module set on PLC side I/F].
• When the GOT and PLC are on the different networks
Select [Other station in the same loop or access to multilevel system] and set [Network No.] and [Station
No.].
Step 11.
[Connection Test] to check if GX Works2 has been connected to the QCPU (Q mode).
Successfully connected with the Q02/Q02HCPU
22.7 Personal Computer Side Setting
22
22 - 107

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents