Mitsubishi Electric GOT2000 Series Connection Manual page 1165

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Step 5.
Set the protocol to TCP. Network No. and Station No. are not required to be changed (default) because
they are not used.
(For bus connection)
Step 6.
Double-click [GOT] of the PLC side I/F to display [PLC side I/F Detailed Setting of GOT].
Step 7.
Set the IP address and port No. in [Ethernet detail setting for PC and GOT connection].
Set the IP address and port No. to the same as the Ethernet download setting.
22.6.1 (2) Ethernet download setting
Step 8.
Check either of the followings in [Detail setting for GOT and PLC connection].
Bus connection
[via GOT(Bus) transparent mode]
Direct CPU connection
Mark the [via GOT(direct coupled) transparent mode] checkbox.
Step 9.
The screen returns to [Transfer Setup]. Click [Connection Test] to check if GX Works2 has been
connected to the QCPU (Q mode).
22.7 Personal Computer Side Setting
22
22 - 109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents