Dlp-H6 Connect Ac Office Power To The Ons 15310-Ma Sdh - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Chapter 16
DLPs H1 to H99

DLP-H6 Connect AC Office Power to the ONS 15310-MA SDH

Purpose
Tools/Equipment
Prerequisite Procedures Connect the office ground to the ONS 15310-MA SDH chassis. For detailed
Required/As Needed
Onsite/Remote
Security Level
Warning
Read the installation instructions before connecting the system to the power source. Statement 1004
Warning
Use copper conductors only. Statement 1025
If you encounter problems with the power supply, refer to the Cisco ONS 15310-MA SDH
Note
Troubleshooting Guide.
Step 1
Plug the AC power cord into the AC power connection on the front of the ONS 15310-MA SDH.
Install the strain-relief bracket over the power connector by using a Phillips screwdriver to screw the
Step 2
screw on the left of the bracket
78-19416-01
This task connects AC power to the ONS 15310-MA SDH shelf.
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
AC power cord
Strain-relief bracket
instructions on grounding, refer to the
(ESD) and Grounding
Guide.
Required
Onsite
None
(Figure
16-3).
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
Cisco ONS Electrostatic Discharge
16-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents