Chapter 18
DLPs H200 to H299
Plug one end of the LAN cable into the LAN port on the 15310E-CTX-K9 faceplate.
Step 1
Connect the other end to the PC you want to use to access CTC.
Step 2
Table 18-18
Table 18-18
RJ-45 Pin Number
1
2
3
4
5
6
7
8
Return to your originating procedure (NTP).
Step 3
DLP-H258 Install CHAMP Cables for E1 Connection
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Always use the supplied ESD wristband when working with a powered ONS 15310-MA SDH. For
Caution
detailed instructions on how to wear the ESD wristband, refer to the
(ESD) and Grounding
Prepare a cable terminated with a 64-pin CHAMP connector.
Step 1
Table 18-19
for connectors J8 and J9 on the EIA installed on the A side, and connectors J21 and J22 on the EIA
installed on the B side.
78-19416-01
shows the LAN cable pin assignments.
LAN Cable Pin Assignments
Function
TX +
TX –
RX +
—
—
RX –
—
—
This task installs E1 cables.
Electrical cable, terminated with a 64-pin CHAMP connector
NTP-H157 Install Wires to Alarm, Timing, Craft, LAN, and UDC Pin
Connections, page 1-26
As needed
Onsite
None
Guide.
lists the Champ connector pin assignments and the corresponding EIA connector mapping
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
Cisco ONS Electrostatic Discharge
18-59