Chapter 4
Turn Up a Network

NTP-H27 Provision a Point-to-Point Network

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
where you want to provision a point-to-point configuration. If you are already logged in, continue with
Step 2.
Click the Provisioning > Protection tabs. Verify that 1+1 protection is created for an optical port on the
Step 2
15310E-CTX-K9. Complete the
procedure on page 3-10
Step 3
Repeat Steps
Step 4
Verify that the working and protect ports in the protection groups correspond to the physical fiber
connections between the nodes, that is, verify that the working port in one node connects to the working
port in the other node and that the protect port in one node connects to the protect port in the other node.
Complete the
Step 5
optical port signal on both point-to-point nodes. Alternatively, if additional bandwidth is needed for CTC
management, complete the
Note
Note
Step 6
As needed, complete the
Step 7
As needed, complete the
As needed, complete the
Step 8
point-to-point nodes.
Step 9
Complete the
locked.
Step 10
Verify that timing is set up at both point-to-point nodes. If not, complete the
procedure on page 3-10
Step 11
Complete the
Stop. You have completed this procedure.
78-19416-01
This procedure provisions two ONS 15310-MA SDH nodes in a 1+1
point-to-point (terminal) network.
None
NTP-H26 Verify Node Turn-Up, page 4-2
As needed
Onsite
Superuser
"DLP-H29 Log into CTC" task on page 16-43
"NTP-H142 Create Protection Groups for ONS 15310-MA SDH"
if protection has not been created.
1
and
2
for the second point-to-point node.
"DLP-H52 Provision Section DCC Terminations" task on page 16-68
"DLP-H53 Provision Line DCC Terminations" task on page
DCC terminations are not provisioned on the protect ports.
If the point-to-point nodes are not connected to a LAN, you will need to create the DCC
terminations using a craft (direct) connection to the node. Remote provisioning is possible only
after all nodes in the network have DCC terminations provisioned to locked on the
15310E-CTX-K9 ports for the ONS 15310 MA.
"DLP-H47 Provision a Proxy Tunnel" task on page
"DLP-H48 Provision a Firewall Tunnel" task on page
"DLP-H49 Create a Provisionable Patchcord" task on page 16-66
"DLP-H50 Change the Service State for a Port" task on page 16-67
for one or both of the nodes.
"NTP-H28 Point-to-Point Network Acceptance Test" procedure on page
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
at the ONS 15310-MA SDH on the network
for the working
16-64.
16-65.
to put the protect port
"NTP-H23 Set Up Timing"
Before You Begin
16-71.
on both
4-4.
4-3