Dlps H1 To H99; Dlp-H1 Unpack And Verify The Shelf Assembly; Dlp-H2 Inspect The Shelf Assembly - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

DLPs H1 to H99

DLP-H1 Unpack and Verify the Shelf Assembly

Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
When you receive the system equipment at the installation site, open the top of the box. The Cisco
Step 1
Systems logo designates the top of the box.
Remove the foam inserts from the box. The box contains the shelf assembly (wrapped in plastic) and a
Step 2
smaller box containing items needed for installation.
To remove the shelf, grasp both sides of the shelf and slowly lift it out of the box.
Step 3
Open the smaller box containing installation materials, and verify that you have all items listed in the
Step 4
"lncluded Materials" section on page 1-3
Return to your originating procedure (NTP).
Step 5

DLP-H2 Inspect the Shelf Assembly

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
78-19416-01
C H A P T E R
This task removes the ONS 15310-MA SDH shelf assembly from the
package.
None
Required
Onsite
None
(ONS 15310-MA SDH).
This task verifies that all parts of the ONS 15310-ma shelf assembly are in
good condition.
None
DLP-H1 Unpack and Verify the Shelf Assembly, page 16-1
Required
Onsite
None
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
16
16-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents