Dlp-H182 Turn On And Verify Ac Office Power; Dlp-H183 Roll The Source Or Destination Of One Optical Circuit - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

DLP-H182 Turn On and Verify AC Office Power

Purpose
Tools/Equipment
Prerequisite Procedures Connect the office ground to the ONS 15310-MA SDH chassis. For detailed
Required/As Needed
Onsite/Remote
Security Level
Step 1
Plug the power cord into an AC wall socket or UPS power supply outlet.
Step 2
Verify the chassis LED activity:
a.
b.
c.
d.
If the ONS 15310-MA SDH does not power up, check the voltage at the power source using a voltmeter.
Step 3
The voltage should be 100-240VAC +/–10 percent.
Return to your originating procedure (NTP).
Step 4

DLP-H183 Roll the Source or Destination of One Optical Circuit

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
From the View menu, choose Go To Network View.
Step 1
Click the Circuits tab.
Step 2
Click the circuit that you want to roll. The circuit must have a DISCOVERED status for you to start a
Step 3
roll.
From the Tools menu, choose Circuits > Roll Circuit.
Step 4
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
17-72
This task verifies the chassis LED activity and verifies power on the AC
ONS 15310-MA SDH chassis.
Voltmeter
instructions on grounding, refer to the
(ESD) and Grounding
DLP-H6 Connect AC Office Power to the ONS 15310-MA SDH, page 16-5
Required
Onsite
None
The FAIL LED blinks red for 20 to 30 seconds, then turns off.
The ALARM LED is off.
The PWR LED is green.
The SYNC LED is green.
This task reroutes traffic from one source or destination to another on the
same circuit, thus changing the original source or destination.
None
DLP-H29 Log into CTC, page 16-43
As needed
Onsite or remote
Provisioning or higher
Chapter 17
Cisco ONS Electrostatic Discharge
Guide.
DLPs H100 to H199
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents