Using a voltmeter, verify the office battery and ground at the following points on the fuse and alarm
Step 2
panel:
a.
b.
According to site practice insert a fuse into the fuse position.
Step 3
Using a voltmeter, verify the shelf for –48 VDC battery and ground:
Step 4
a.
b.
Return to your originating procedure (NTP).
Step 5

DLP-H10 Install Timing Cables on the ONS 15310-MA SDH

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Plug one end of the timing cable into the BITS port on the front of the ONS 15310-MA SDH.
Step 1
Plug the other end of the cable into the BITS clock according to local site practice.
Step 2
BITS cable pin assignments.
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
16-10
To verify the power, place the black test lead of the voltmeter to the frame ground. Place the red test
lead on the A-side connection and verify that it is between -44 VDC and -52 VDC. Next, place the
red test lead on the B-side connection and verify that it is between -44 VDC and -52 VDC.
Note
The voltages -44 VDC and -52 VDC are the minimum and maximum voltages required to
power the chassis. The nominal steady-state voltage is -48 VDC.
To verify the ground, place the black test lead of the voltmeter to the frame ground. Place the red
test lead on the A-side return ground and verify that no voltage is present. Place the red test lead on
the B-side return ground and verify that no voltage is present.
To verify the A-side of the shelf, place the black lead of the voltmeter to the frame ground. Place the
red test lead to the BAT1 (A-side battery connection) red cable. Verify that it reads between –44
VDC and –52 VDC. Then place the red test lead of the voltmeter to the RET1 (A-side return ground)
black cable and verify that no voltage is present.
To verify the B-side of the shelf, place the black test lead of the voltmeter to the frame ground. Place
the red test lead to the BAT2 (B-side battery connection) red cable. Verify that it reads between –44
VDC and -52 VDC. Then place the red test lead of the voltmeter to the RET2 (B-side return ground)
black cable and verify that no voltage is present.
This task installs timing cables so that you can provide BITS timing to the
ONS 15310-MA SDH.
Timing cable, CAT-5 RJ-45 connector
NTP-H150 Install the Shelf Assembly, page 1-5
As needed
Onsite
None
Chapter 16
DLPs H1 to H99
Table 16-1
shows the
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents