Install the strain-relief bracket over the power connector by using a Phillips screwdriver to screw the two
Step 12
screws at the top left and right of the bracket
Figure 16-7
If you want to provide redundant power supplies, repeat for the other power plug. If not, install the solid
Step 13
metal bracket over the extra plug, using two screws to the top left and right of the plug.
Return to your originating procedure (NTP).
Step 14

DLP-H8 Turn On and Verify DC Office Power on the ONS 15310-MA SDH

Purpose
Tools/Equipment
Prerequisite Procedures Connect the office ground to the ONS 15310-MA SDH chassis. For detailed
Required/As Needed
Onsite/Remote
Security Level
After applying power to the ONS 15310-MA SDH chassis, verify the chassis LED activity:
Step 1
a.
b.
c.
d.
78-19416-01
Installed DC Power and Strain Relief Bracket
This task verifies the ONS 15310-MA SDH chassis LED activity and
measures the DC power to verify correct power and returns.
Voltmeter
instructions on grounding, refer to the
(ESD) and Grounding
DLP-H7 Connect DC Office Power to the ONS 15310-MA SDH, page 16-6
Required
Onsite
None
The FAIL LED blinks red for 20 to 30 seconds, then turns off.
The ALARM LED is off.
The PWR LED is green. (It is amber only if one DC power source is on and operating.)
The SYNC LED is green.
(Figure
16-7).
Guide.
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
Cisco ONS Electrostatic Discharge
16-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents