Ntp- H151 Install The Power And Ground - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Required Tools and Equipment
Figure 1-5
Caution
Threading one jack screw completely before threading the other jack screw might result in connector
misalignment and damage to the EIA. Do not overtighten the jack screws.
Install the remaining three 6-32 x 5/16-inch pan head screws onto the EIA and torque to 8 to 10 in-lbs.
Step 6
Repeat Steps
Step 7
Step 8
Continue with the
Stop. You have completed this procedure.
NTP-H151 Install the Power and Ground
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
A 1-inch (minimum) wide copper braid is required to ground the ONS 15310-MA SDH OSP cabinet and
Note
is recommended for indoor installations.
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
1-12
EIA Jack Screw
Inner screw
Rotation indicator
Thumbscrew
2
through
6
to install the other EIA, as necessary.
"NTP-H151 Install the Power and Ground" procedure on page
This procedure describes how to install power feeds and how to ground the
ONS 15310-MA SDH.
Ground cable, #6 AWG stranded copper conductors, minimum
90 degrees C (194 degrees F).
Copper power cable (from fuse and alarm panel to assembly).
#12 AWG stranded copper conductors, minimum 90 degrees C
(194 degrees F).
A 1-inch (minimum) wide copper braid.
NTP-H150 Install the Shelf Assembly, page 1-5
Required
Onsite
None
Chapter 1
Install the Cisco ONS 15310-MA SDH
1-12.
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents