Dlp-H52 Provision Section Dcc Terminations - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Note
For more information about port service states, refer to the "Administrative and Service States" appendix
of the Cisco ONS 15310-MA SDH Reference Manual.
If the port is in loopback (locked-enabled,loopback & maintenance) and you set the Admin State to
Step 4
unlocked, a confirmation window displays indicating that the loopback will be released and that the
action could be service affecting. To continue, click Yes.
If you set the Admin State to Automatic In Service, set the soak period time in the automaticInService
Step 5
Soak field. This is the amount of time that the port will stay in the unlocked-disabled,automaticInService
service state after a signal is continuously received. When the soak period elapses, the port changes to
the unlocked-enabled service state.
Note
Click Apply.
Step 6
As needed, repeat this task for each port.
Step 7
Return to your originating procedure (NTP).
Step 8

DLP-H52 Provision Section DCC Terminations

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
When RS-DCC is provisioned, an MS-DCC termination is allowed on the same port, but is not
Note
recommended. Using RS-DCC and MS-DCC on the same port is only needed during a software upgrade
if the software version does not support MS-DCC. You can provision RS-DCCs and MS-DCCs on
different ports in the same node.
In node view click the Provisioning > Comm Channels > RS-DCC tabs.
Step 1
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
16-68
CTC will not allow you to change a port service state from unlocked-enabled to
locked-enabled,disabled. You must first change a port to the locked-enabled,maintenance
service state before putting it in the locked-enabled,disabled service state.
A continuously valid signal must be received for the duration of the soak period before the
unlocked-disabled,automaticInService port makes a transition to the unlocked-enabled state. For
example, if the soak timer is set for eight hours, and you receive an error after two hours, the
timer is reset for another eight-hour period. This cycle continues until an error-free signal is
received for an eight-hour period.
This task creates the SDH Data Communications Channel (DCC)
terminations required for alarms, administration, data, signal control
information, and messages. In this task, you can also set up the node so that
it has direct IP access to a far-end non-ONS node over the DCC network.
None
DLP-H29 Log into CTC, page 16-43
As needed
Onsite or remote
Provisioning or higher
Chapter 16
DLPs H1 to H99
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents