Chapter 4
Turn Up a Network
At the circuit source:
Step 12
Connect the Tx connector of the test set to the circuit Rx connector.
a.
Connect the test set Rx connector to the circuit Tx connector.
b.
Verify that the test set shows a clean signal. If a clean signal does not appear, repeat Steps
Step 13
to make sure the test set and cabling are configured correctly.
Inject BIT errors from the test set. To verify that you have a complete end-to-end circuit, verify that the
Step 14
errors appear at the test set.
From the View menu, choose Go to Network View.
Step 15
Click one of the two spans leaving the circuit source node.
Step 16
Test the path protection switching function on this span. Complete the
Step 17
Switching Test" task on page
In network view, click the other circuit source span and repeat
Step 18
Set up and complete a BER Test. Use the existing configuration and follow your site requirements for
Step 19
the length of time. Record the test results and configuration.
Step 20
Complete the
Remove any loopbacks, switches, or test sets from the nodes after all testing is complete.
Step 21
Click the Alarms tab and click Synchronize.
Step 22
Verify that the alarm filter is not on. See the
a.
page 16-107
Verify that no unexplained alarms appear on the network. If alarms are present, investigate and
b.
resolve them before continuing. Refer to the Cisco ONS 15310-MA SDH Troubleshooting Guide if
necessary.
c.
Complete the
your hard drive.
On the Conditions tab, and click Retrieve.
Step 23
a.
Verify that the network does not have any unexplained conditions. If unexplained conditions are
present, resolve them before continuing. Refer to the Cisco ONS 15310-MA SDH Troubleshooting
Guide if necessary.
Complete the
b.
on your hard drive.
Repeat Steps
Step 24
third-party network.
If a node fails any test, repeat the test while verifying correct setup and configuration. If the test fails
Step 25
again, refer to the next level of support.
After all tests are successfully completed and no alarms exist in the network, the network is ready for
service application. Continue with
Stop. You have completed this procedure.
78-19416-01
16-74.
"DLP-H115 Delete Circuits" task on page 17-19
as necessary.
"DLP-H223 Export CTC Data" task on page 18-20
"DLP-H223 Export CTC Data" task on page 18-20
6
through
23
for each node that will be a source or destination for circuits traversing the
Chapter 5, "Create Circuits and VC Low-order Path Tunnels."
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
"DLP-H55 Path Protection
Step
17.
for the test circuit.
"DLP-H88 Disable Alarm Filtering" task on
to export alarm data to a file on
to export condition data to a file
Before You Begin
1
through
8
4-17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents