Chapter 17
DLPs H100 to H199

DLP-H167 Clear a Path Protection Force Switch

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
From the View menu, choose Go to Network View.
Step 1
Right-click the span where you want to clear the switch. Choose Circuits from the shortcut menu.
Step 2
In the Circuits on Span dialog box, choose CLEAR to remove the switch. Click Apply.
Step 3
In the Confirm Path Protection Switch dialog box, click Yes.
Step 4
In the Protection Switch Result dialog box, click OK.
Step 5
In the Circuits on Span window, the Switch State for all path protection circuits is CLEAR.
Return to your originating procedure (NTP).
Step 6

DLP-H168 Verify Pass-Through Circuits

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
In the CTC Circuits window, choose a circuit that passes through the target node and click Edit.
Step 2
In the Edit Circuits window, check Show Detailed Map.
Verify that the VC high-order path and VC low-order path mapping on the node's east and west ports are
Step 3
the same. For example, if a circuit mapping on the west port s5/p1-1/S1 (Slot 5, Port 1-1, VC3), verify
that the mapping is VC3 on the east port. If the circuit appears different VC high-order paths and/or VC
low-order paths on the east and west ports, write down the name of the circuit.
Repeat Steps
Step 4
Delete and recreate each circuit recorded in Step
high-order paths. To delete the circuit, complete the
To create circuits, complete the appropriate procedures in
Path Tunnels."
78-19416-01
This task clears a path protection Force switch.
None
DLP-H29 Log into CTC, page 16-43
As needed
Onsite or remote
Provisioning or higher
This task verifies that circuits passing through a node that will be removed
enter and exit the node on the same VC high-order path and/or VC
low-order path.
None
DLP-H29 Log into CTC, page 16-43
As needed
Onsite or remote
Provisioning or higher
1
through
3
for each circuit displayed in the Circuits tab.
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
3
that entered/exited the node on different VC
"DLP-H115 Delete Circuits" task on page
Chapter 5, "Create Circuits and VC Low-order
17-19.
17-59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents