Dlp-H4 Mount Multiple Ons 15310-Ma Sdh Shelf Assemblies In A Rack - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Align the screw holes on the mounting ears with the mounting holes in the rack.
Step 4
Using the Phillips screwdriver, install one mounting screw in each side of the assembly.
Step 5
When the shelf assembly is secured to the rack, install the remaining mounting screws.
Step 6
Return to your originating procedure (NTP).
Step 7

DLP-H4 Mount Multiple ONS 15310-MA SDH Shelf Assemblies in a Rack

Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Step 1
If DC power will be applied, verify that the proper fuse and alarm panel has been installed in the top
mounting space. If a fuse and alarm panel is not present, you must install one according to manufacturer
instructions. A fuse panel with two 5-amp (minimum) fuses per shelf is required for Power A and B
feeds.
Maximum amp rating of the fuse is determined by the rated ampacity of the selected power cable (refer
Caution
to manufacturer's instructions). The fuse rating should not exceed 15 Amp.
Step 2
Mount the first ONS 15310-MA SDH using the
task on page
Note
Repeat the task with the remaining ONS 15310-MA SDH nodes.
Step 3
Return to your originating procedure (NTP).
Step 4
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
16-4
This task installs multiple ONS 15310-MA SDH shelf assemblies in a rack.
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
As needed
Onsite
None
16-2.
If you want to install a tie-down bar on the rack, be sure to leave 1 RU spacing between the ONS
15310-MA SDH and any adjacent equipment you plan to install on the rack. This will provide
adequate space for the tie-down bar and cabling.
"DLP-H3 Mount the ONS 15310-MA SDH in a Rack"
Chapter 16
DLPs H1 to H99
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents