Figure - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Chapter 4
Turn Up a Network
Broadband Electrical ports (BBE) DS3/E3—On the ONS 15310-MA SDH, if you are testing a clear
channel DS3/ E3, use the BNC connectors on the BICs on the rear of the chassis. Set the test set for
clear channel DS3/E3. For information about configuring your test set, consult your test set user
guide.
STM-M—If you are testing an STM-M circuit, set the test set for the applicable circuit size. For
information about configuring your test set, consult your test set user guide.
Verify the integrity of all patch cables that will be used in this test by connecting one end to the test set
Step 8
transmit (Tx) connector and the other end to the test set receive (Rx) connector. If the test set does not
run error-free, check the cable for damage and check the test set to make sure it is set up correctly before
going to
Step 9
Create a physical loopback at the circuit destination. To do so, attach one end of a patch cable to the
destination port Tx connector; attach the other end to the port Rx connector.
Step 10
At the circuit source:
a.
Connect the Tx connector of the test set to the Rx connector on the circuit source port.
b.
Connect the test set Rx connector to the circuit Tx connector on the circuit source port.
Verify that the test set displays a clean signal. If a clean signal is not present, repeat Steps
Step 11
sure the test set and cabling are configured correctly.
Step 12
If a node fails any test, repeat the test while verifying correct setup and configuration. If the test fails
again, refer to the next level of support.
Step 13
Inject BIT errors from the test set. Verify that the errors display at the test set, indicating a complete
end-to-end circuit.
Complete the
Step 14
Step 15
Set up and complete a BER test. Use the existing configuration and follow your site requirements for the
specified length of time. Record the test results and configuration.
Remove any loopbacks, switches, or test sets from the nodes after all testing is complete. Refer to the
Step 16
Cisco ONS 15310-MA SDH Troubleshooting Guide if necessary.
From the View menu choose Go to Network View.
Step 17
Click the Alarms tab and click Synchronize.
Step 18
Verify that the alarm filter is not on. See the
a.
page 16-107
Verify that no unexplained alarms appear on the network. If alarms are present, investigate and
b.
resolve them before continuing. Refer to the Cisco ONS 15310-MA SDH Troubleshooting Guide if
necessary.
Complete the
c.
Repeat Steps
Step 19
If a node fails any test, repeat the test while verifying correct setup and configuration. If the test fails
Step 20
again, refer to the next level of support.
Delete the test circuit. See the
Step 21
After all tests are successfully completed and no alarms exist in the network, the network is ready for
service application.
Stop. You have completed this procedure.
78-19416-01
Step
9.
"DLP-H54 Optical 1+1 Protection Test" task on page
as necessary.
"DLP-H223 Export CTC Data" task on page 18-20
9
to
18
for the other point-to-point node.
"DLP-H115 Delete Circuits" task on page 17-19
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
16-72.
"DLP-H88 Disable Alarm Filtering" task on
to export the alarm data to a file.
Before You Begin
6
to
10
to make
for instructions.
4-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents