Ntp-H28 Point-To-Point Network Acceptance Test; Figure - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Before You Begin

NTP-H28 Point-to-Point Network Acceptance Test

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
are already logged in, continue with Step 2.
From the View menu choose Go to Network View.
Step 2
Click the Alarms tab and click Synchronize.
Step 3
a.
b.
c.
On the Conditions tab, and click Retrieve.
Step 4
a.
b.
Step 5
On the network map, double-click a point-to-point node to open it in node view.
Create a test circuit from the login node to the other point-to-point node:
Step 6
For the ONS 15310-MA SDH, configure the test set for the test circuit type you created:
Step 7
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
4-4
This procedure tests two ONS 15310-MAs in a point-to-point network.
Test set/cables appropriate to the test circuit you will create
NTP-H27 Provision a Point-to-Point Network, page 4-3
As needed
Onsite
Provisioning or higher
"DLP-H29 Log into CTC" task on page 16-43
Verify that the alarm filter is not on. See the
page 16-107
as necessary.
Verify that no unexplained alarms appear on the network. If alarms are present, investigate and
resolve them before continuing. Refer to the Cisco ONS 15310-MA SDH Troubleshooting Guide if
necessary.
Complete the
"DLP-H223 Export CTC Data" task on page 18-20
Verify that the network does not have any unexplained conditions. If unexplained conditions are
present, resolve them before continuing. Refer to the Cisco ONS 15310-MA SDH Troubleshooting
Guide if necessary.
Complete the
"DLP-H223 Export CTC Data" task on page 18-20
file.
For E1 circuits, complete the
page
5-5. When you set the circuit state, choose unlocked and check the Apply to drop ports check
box.
For DS3/E3 circuits, complete the
procedure on page
5-15. When you set the circuit state, choose unlocked and check the Apply to
drop ports check box.
For optical circuits, complete the
procedure on page
5-32. When you set the circuit state, choose unlocked and check the Apply to
drop ports check box.
Wideband Electrical ports (WBE) E1—On the ONS 15310-MA SDH, if you are testing an unmuxed
E1, use the Champ connectors on the BICs on the rear of the chassis. Set the test set for E1. For
information about configuring your test set, consult your test set user guide.
"DLP-H88 Disable Alarm Filtering" task on
"NTP-H37 Create an Automatically Routed E1 Circuit" procedure on
"NTP-H40 Create an Automatically Routed DS-3 or E3 Circuit"
"NTP-H47 Create an Automatically Routed Optical Circuit"
Chapter 4
Turn Up a Network
at one of the point-to-point nodes. If you
to export the alarm data to a file.
to export the condition data to a
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents