Connect The Ac-Input Power Supply Unit - Cisco OL-7822-06 Quick Start Manual

Cisco service control engine
Table of Contents

Advertisement

Connecting the Power
Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front
Step 7
panel. If the DC-input power supply unit is operating properly, these LEDs will be glowing green.
Ensure that the power supply is properly aligned and the installation screw is tightened.
Step 8

Connect the AC-Input Power Supply Unit

Step 1
Plug the AC-input power cable into the AC-input power receptacle on the AC-input power supply
For AC-input power, we recommend powering the SCE 2000 platform from a 120 VAC, 15A receptacle
U.S. (240 VAC, 10A international) at the power source.
Figure 3-4
Plug the AC power supply cable into the AC power source.
Step 2
Turn the on/off switch to the on position.
Step 3
Step 4
Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front
panel. If the AC-input power supply unit is operating properly, these LEDs will be glowing green.
Step 5
Ensure that the power supply is properly aligned and the installation screw is tightened.
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
3-4
Connecting the AC Power
BY PA SS
1
IN
PO W ER B
OK
IN
PO W ER A
OK
Chapter 3
Connect the Power Supply Units
OL-7822-06

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000 2xgbe

Table of Contents