Before You Begin - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Install the Cisco ONS 15310-MA SDH
This chapter provides procedures for installing the Cisco ONS 15310-MA SDH shelf, cards, and
fiber-optic cable. To view a summary of the tools and equipment required for installation, see the
"Required Tools and Equipment" section on page

Before You Begin

This section lists the chapter procedures (NTPs). Turn to a procedure for applicable tasks (DLPs).
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
78-19416-01
NTP-H149 Unpack and Inspect the ONS 15310-MA SDH Shelf Assembly, page
procedure before continuing with the
page
1-5.
NTP-H150 Install the Shelf Assembly, page
assembly in a rack before continuing with the
on page 1-12
or before completing one of the following optional procedures.
NTP-H169 Install the Cable Management Bracket, page
to install the cable management bracket.
NTP-H166 Remove the Blank Sheet Metal Covers, page
to access the backplane.
NTP-H167 Install the EIAs, page
interface assemblies (EIAs) before continuing with the
procedure on page
1-12.
NTP-H151 Install the Power and Ground, page
with the
"NTP-H152 Install the Fan-Tray Assembly" procedure on page
NTP-H152 Install the Fan-Tray Assembly, page
with the
"NTP-H153 Install the 15310E-CTX-K9 Cards" procedure on page
NTP-H153 Install the 15310E-CTX-K9 Cards, page
common- control/cross-connect cards.
NTP-H154 Install the Ethernet Cards, page
Ethernet card.
NTP-H187 Install STM-N Cards and Connectors, page
to install STM-N cards and connectors.
NTP-H155 Install the Electrical Cards, page
electrical card.
C H A P T E R
1-3.
"NTP-H150 Install the Shelf Assembly" procedure on
1-5—Complete this procedure to install the shelf
"NTP-H151 Install the Power and Ground" procedure
1-10—As needed, complete this procedure to install the electrical
1-12—Complete this procedure before continuing
1-14—Complete this procedure before continuing
1-16—Complete this procedure to install the
1-19—As needed, complete this procedure to install an
1-23—As needed, complete this procedure to install an
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
1
1-4—Complete this
1-6—As needed, complete this procedure
1-9—As needed, complete this procedure
"NTP-H151 Install the Power and Ground"
1-14.
1-16.
1-20—As needed, complete this procedure
1-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents