Ntp-B124 Provision A Point-To-Point Network - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

NTP-B124 Provision a Point-to-Point Network

NTP-B124 Provision a Point-to-Point Network
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Log into an ONS 15327 on the network where you want to provision a point-to-point configuration. See
Step 1
the
with Step 2.
Step 2
Click the Provisioning > Protection tabs. Verify that 1+1 protection is created for the OC-N cards.
Complete the
not been created.
Repeat Steps
Step 3
Step 4
Verify that the working and protect cards in the 1+1 protection groups correspond to the physical fiber
connections between the nodes, that is, verify that the working card in one node connects to the working
card in the other node and that the protect card in one node connects to the protect card in the other node.
Complete the
Step 5
OC-N port on both point-to-point nodes.
Note
Note
Verify that timing is set up at both point-to-point nodes. If not, complete the
Step 6
procedure on page 3-16
the timing source.
Complete the
Step 7
Stop. You have completed this procedure.
Cisco ONS 15327 Procedure Guide, R4.0
4-4
This procedure provisions two ONS 15327s in a point-to-point (terminal)
network.
None
NTP-B35 Verify Node Turn Up, page 4-2
Required
Onsite
Provisioning or higher
"DLP-B60 Log into CTC" task on page 2-23
"NTP-B170 Create Optical Protection Groups" procedure on page 3-20
1
and
2
for the second point-to-point node.
"DLP-B253 Provision SONET DCC Terminations" task on page 4-5
DCC terminations are not provisioned on the protect ports.
If the point-to-point nodes are not connected to a LAN, you will need to create the DCC
terminations using a craft (direct) connection to the node. Remote provisioning is possible only
after all nodes in the network have DCC terminations provisioned to in-service OC-N ports.
for one or both of the nodes. If a node uses line timing, make its working OC-N
"NTP-B173 Point-to-Point Network Acceptance Test" procedure on page
for instructions. If you are already logged in, continue
Chapter 4
Turn Up Network
if protection has
for the working
"NTP-B28 Set Up Timing"
4-7.
March 2003

Advertisement

Table of Contents
loading

Table of Contents