Dlp-B322 Install Timing Cables; Figure 1-11 Pins 1 And 8 On The Rj-45 Connector; Table 1-2 Alarm (External Control) Output Pin Assignments - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

NTP-B8 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections
Table 1-1
Alarm Number (MIC A)
6
Table 1-2
Alarm Number (MIC A)
2

Figure 1-11 Pins 1 and 8 on the RJ-45 Connector

Pin 1
Return to your originating procedure (NTP).
Step 5

DLP-B322 Install Timing Cables

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Plug one end of the timing cable into the BITS port on the MIC.
Step 1
Plug the other end of the cable into the BITS clock according to local site practice.
Step 2
Repeat Steps
Step 3
BITS cables to the ONS 15327.
Cisco ONS 15327 Procedure Guide, R4.0
1-30
Alarm Input Pin Assignments
Alarm Number (MIC B)
5
Alarm (External Control) Output Pin Assignments
Alarm Number (MIC B)
1
Pin 8
This task installs timing cables on the MICs so that you can provide BITS
timing to the ONS 15327.
#22 or #24 shielded AWG wire
NTP-B2 Install the Shelf Assembly, page 1-5
Required if the node is using external BITS timing
Onsite
None
1
and
2
for the other MIC. See
RJ-45 Pin Number
1
2
RJ-45 Pin Number
7
8
Table
1-3,
Figure
1-12, and
Chapter 1
Install Hardware
Function
Alarm 0+
Alarm 0-
Function
Contact+
Contact-
Figure 1-13
when connecting
March 2003

Advertisement

Table of Contents
loading

Table of Contents