Install the Cisco Catalyst 8300 Series Edge uCPE
•
•
•
•
Unpacking the Device
The device, accessory kit, publications, and any optional units may be shipped in more than one container.
When you unpack the containers, check the packing list to ensure that you have received all the items on the
list.
Only unpack the product when you are ready to install it.
Installing the Cisco Catalyst 8300 Series Edge uCPE
If not already installed, the DIMMs must be installed before rack-mounting the chassis.
Desktop-Mounting the Chassis
The Cisco Catalyst 8300 Edge uCPE has circular markings on the bottom of the chassis for rubber feet. Apply
the rubber feet when installing the router on horizontal surface (desk or shelf).
Unpacking the Device, on page 17
Installing the Cisco Catalyst 8300 Series Edge uCPE, on page 17
Grounding the Chassis, on page 28
Initial Server Setup, on page 29
C H A P T E R
Cisco Catalyst 8300 Series Edge uCPE Hardware Installation Guide
3
17