Mitsubishi Electric GOT2000 Series Connection Manual page 1204

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Step 7.
Specify the IP address for [IP address] same as the IP address assigned to the C Controller module (Q
Series) (Q24DHCCPU-V).
Step 8.
The screen returns to [Transfer Setup]. Click [Connection Test] to check if Setting/Monitoring tool for C
Controller module has been connected to the C Controller module (Q Series) (Q24DHCCPU-V).
■2. When connecting the GOT and personal computer in Ethernet connection
(1) When connecting the GOT and PLC in bus connection
Step 1.
Click the Connection Destination view
the Navigation window of MT Setting/Monitoring tool for C Controller module.
Step 2.
The [Transfer Setup] is displayed.
Step 3.
Set the [Transfer Setup]:
PC side I/F : Ethernet Board
PLC side I/F : GOT
Other station : No specification
Step 4.
Double-click [Ethernet Board] of the PC side I/F to display [PC side I/F Ethernet Board Setting].
22 - 148
22.7 Personal Computer Side Setting
[Connection Destination]
[(Connection target data name)] in

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents