Step 5.
Set the protocol to TCP. Network No. and Station No. are not required to be changed (default) because
they are not used.
Step 6.
Double-click [GOT] of the PLC side I/F to display [PLC side I/F Detailed Setting of GOT].
Step 7.
Set the IP address and port No. in [Ethernet detail setting for PC and GOT connection].
Set the IP address and port No. to the same as the Ethernet download setting.
22.6.1 (2) Ethernet download setting
Step 8.
The screen returns to [Transfer Setup]. Click [Connection Test] to check if Setting/Monitoring tool for C
Controller module has been connected to the motion controller (Q mode).
22.7 Personal Computer Side Setting
22
22 - 149