Mitsubishi Electric GOT2000 Series Connection Manual page 1215

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■10. When connecting the GOT and the personal computer by USB
When the operations shown below are executed, the operation is executed in the PLC. However, the display on the
GOT may stop temporarily or the display of timeout may appear on GX Works3, GX Works2.
• Remote Reset
• Remote RUN
• Remote STOP
• Remote PAUSE
• Remote STEP-RUN
• Remote Reset
• Remote latch clear
• Write clock data
• CC IE Control diagnostics
(Link startup/stop)
• CC IE Field diagnostics
(Link startup/stop)
*1
The remote operations only of when the connection type between the GOT and CPU is the direct CPU connection or computer
link connection are applied.
*1
Operation
Remark
Applied for the following operations specifying the currently selected station.
Applied for the following operations specifying all the station.
22.8 Precautions
22 - 159
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents