iView - Controller View
Car Operation - Flood Operation Tab
This tab allows the elevator to be configured for emergency operation during flood conditions.
Enable
In areas where flood operation is not required, this option may be left unchecked.
If enabled, the flood condition selections on the screen become active.
Flood Floors
topography and construction at each job site will determine which and how many floors are
affected.
• Click in the Flood floors column, the floors that should not be serviced during flood opera-
tion. A check mark will appear next to each selected floor.
9-76 Manual # 42-02-2222
During flood operation, floors in danger of flooding shall be avoided. The