In This Section
This section describes the sequence of steps required to make final adjustments to,
and complete final inspection of, the elevator system. At this point, all steps in Sec-
tions 2 and 3 should have been completed.
•
Learning the Floor Heights
•
Verifying One-Floor Run Operation
•
Reaching Contract Speed
•
Learning Normal & Emergency Terminal Limit Switches
•
Shaping the Speed Profile
•
Controlling the Start of Car Motion
•
Calibrating the Floor Offsets
•
Adjusting Leveling and Final Stop
•
Load Weigher Adjustment for Dispatching
•
Pre-Start Sequence
•
Calibration and Verification of Safety Functions
•
Safety Tests
(see
page
•
Terminal Switch Faults
Final Adjustment
(see
page
(see
page
4-7).
(see
page
4-12).
(see
page
(see
page
4-23).
(see
page
(see
page
4-35).
4-43).
(see
page
4-55).
• In this Section
• Learning Floor Heights
• Verifying One Floor Run
• Reaching Contract Speed
• Learning Limit Switches
• Shaping Speed Profile
• Controlling Initial Start
• Calibrating Floor Offsets
• Adjusting Leveling
• Load Weigher Adjust
• Pre-Start Sequence
• Safety Verification
• Safety Tests
• Terminal Switch Faults