Installation Checklist (page 2 of 3)

Calibrate the brake
Verify that the brake is picking properly
Verify proper car movement on inspection
(TORQMAX)" on page
Verify pattern command and drive speed feedback
Drive Speed Feedback" on page
Calibrate the car speed
Set the following error parameter - tach error tripping threshold
gin" on page 2-58
Verify electronic motor overload protection
Verification" on page
Verify proper mounting of iLand landing system
Verify proper installation of the floor magnets
on page
3-9).
Verify iLand connection to iLink
Verify proper installation of iLink
Install the hoistway limit switches per the job prints
Switches" on page
Install the Load Weigher, if applicable
see "EMCO Load Weigher Installation and Calibration" on page 5-53
Weigher" on page
Install the optional Brake Pick Switch, if applicable
page
3-20).
Install the earthquake sensor, if applicable
page
3-21).
Install the serial hall call system
Install the serial COP system, if applicable
page
3-22).
Verify the cartop voltages
Verify door operation
Verify the safety configuration
Exit construction mode / begin running on inspection
page 3-25
and
Verify the quadrature pulse sequence
Encoder Resolution " on page
Perform final door operator checks
Perform the counterweight learn and counterweight balancing procedures
weight Learn Procedure" on page
Perform the run and empty car tests
Tests" on page

Installation Checklist (page 3 of 3)

Learn the building floor heights
Intro-8 Manual # 42-02-2222 B6, July 2010
(see "Brake Calibration" on page
2-55).
2-56).
(see "Calibrating Actual Car Speed" on page
and
see "Tach Error Tripping Threshold Adjustment" on page
2-60).
(see "Cabling Connections" on page
(see "Installing iLink" on page
3-19).
5-63).
(see "Installing the Serial Hall Call System" on page
(see "Verifying Cartop Voltages" on page
(see "Verifying Door Operation" on page
(see "Verifying the Safety Configuration" on page
see "Running on Machine Room Inspection" on page
3-27).
(see "Door Operator" on page
3-28).
3-31).
(see "Learning the Floor Heights" on page
2-50).
(see "Verify Brake Picking" on page
(see "Verifying Car Direction and Motor Control
(see "Verify Pattern Command and
(see "Electronic Motor Overload Protection
(see "Cartop Mounting" on page
(see "Installing the Floor Leveling Magnets"
(see "Installing the Hoistway Limit
(see "Installing the Load Weigher" on page 3-19
(see "Installing Brake Monitoring" on
(see "Installing the Earthquake Sensor" on
(see "Installing the Serial COP System" on
(see "Exit Construction Mode" on
(see "Verifying Quadrature Pulse Sequence and
(see "Run Testing" on page 3-30
2-53).
2-57).
(see "Following Error Mar-
2-59).
3-3).
3-11).
3-13).
or
see "MCE Load
3-22).
3-23).
3-24).
3-25).
3-26).
3-28).
(see "Counter-
and
see "Empty Car
4-2).
and