Specifying The Setpoint Via The Fieldbus; Setting With Receive Word Pzd02 As Setpoint Source; Fieldbus As Setpoint Source - Siemens SINAMICS G120XA Operating Instructions Manual

Table of Contents

Advertisement

Advanced commissioning
6.4 Setpoints and setpoint processing
6.4.1.2

Specifying the setpoint via the fieldbus

Function description
Figure 6-28
In the quick commissioning, you define the preassignment for the converter interfaces.
Depending on what has been preassigned, after quick commissioning, the receive word PZD02
can be interconnected with the main setpoint.
Example

Setting with receive word PZD02 as setpoint source:

Parameter
p1070 = 2050[1]
p1075 = 2050[1]
Parameters
Number
p1070[C]
p1071[C]
r1073
p1075[C]
p1076[C]
r1077
r2050[0...11]
226

Fieldbus as setpoint source

Description
Interconnects the main setpoint with the receive word PZD02 from the fieldbus.
Interconnects the supplementary setpoint with receive word PZD02 from the field‐
bus.
Name
CI: Main setpoint
CI: Main setpoint scaling
CO: Main setpoint active
CI: Supplementary setpoint
CI: Supplementary setpoint scaling
CO: Supplementary setpoint effective
CO: PROFIdrive PZD receive word
Operating Instructions, 03/2019, FW V1.0, A5E44751205B AB
Factory setting
Dependent on the
converter
1
- rpm
0
1
- rpm
-
SINAMICS G120XA converter