Backup Using The Operator Panel; Transfer To The Converter - Siemens SINAMICS G120XA Operating Instructions Manual

Table of Contents

Advertisement

Saving the settings and series commissioning
8.2 Operator panel
8.2
Operator panel
8.2.1

Backup using the operator panel

Precondition
The converter power supply has been switched on.
Function description
Procedure
You have backed up the settings to the BOP-2.
8.2.2

Transfer to the converter

Precondition
The converter power supply has been switched on.
732
1. In the "OPTIONS" menu, select "TO BOP".
2. Start data transfer with OK.
3. Wait until the converter has backed up the settings to the BOP‑2.
Operating Instructions, 03/2019, FW V1.0, A5E44751205B AB
SINAMICS G120XA converter

Advertisement

Table of Contents
loading

Table of Contents