6.3.3
Specifying the setpoint via the fieldbus
Interconnecting the fieldbus with the main setpoint
Image 6-16
Most standard telegrams receive the speed setpoint as a second process data PZD2.
Table 6- 12
Parameter
p1070 = 2050[1]
p1075 = 2050[1]
Converter with control units CU240D-2
Operating Instructions, 07/2016, FW V4.7 SP6, A5E34262100B AD
Fieldbus as setpoint source
Setting the fieldbus as setpoint source
Remark
Main setpoint
Interconnect the main setpoint with process data PZD2 from the fieldbus.
Additional setpoint
Interconnect the additional setpoint with process data PZD2 from the fieldbus.
Advanced commissioning
6.3 Setpoints
139