1
2
Figure 65 Pouch slot and lever
Slot of the lever assembly
1
Label facing the instrument
2
Lever
3
4. Wipe the pouch connector on the instrument with a moistened lab wipe.
5. Install the new polymer pouch:
a. Remove the seal from the conditioning reagent pouch.
b. With the label facing the rear of the instrument, insert the pouch fitting into the slot on the
pump lever mechanism.
c. Push the polymer pouch lever up.
6. Tap Verify pouch to update the pouch information.
7. Close the instrument doors.
8. Tap Prime pump.
Wait ~3 minutes for the prime pump procedure to complete.
SeqStudio
™
Flex Series Genetic Analyzer with Instrument Software v1.0 User Guide
Chapter 13 Maintain the Instrument
Maintenance wizard procedures
3
13
419