Basic Commissioning With Operator Panel Bop-2 - Siemens SINAMICS G120 Operating Instructions Manual

Frequency converter
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Basic commissioning

6.4 Basic commissioning with Operator Panel BOP-2

6.4
Basic commissioning with Operator Panel BOP-2
Installing the basic operator panel BOP-2 and selecting basic commissioning
1. Remove the blind cover on the converter.
2. A: Place the bottom edge of the BOP-2 casing into the
3. Wait until the operator panel displays setpoint [1/min] and
4.
5.
6.
Overview of the BOP-2 menu
OK ESC
60
lower recess of the converter housing.
B: Push the BOP-2 towards the converter until the
release-catch clicks into place on the converter housing.
speed [1/min].
Press the ESC key.
Press one of the arrow keys until the operator
panel displays the SETUP menu.
In the SETUP menu press the OK
OK
button to start the basic
commissioning.
Futher steps see next section (Page 61).
OK ESC
OK ESC
OK ESC
OK ESC
OK ESC
SINAMICS G120C frequency converter
Operating Instructions, 03/2012, FW V4.5, A5E02999804B AB
OK ESC
OK ESC

Advertisement

Table of Contents
loading

Table of Contents