Nortel DMS-100 Series Maintenance Manual page 634

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

13-32 OPM routine maintenance procedures
Discharge test failure
OPM
(continued)
Summary of discharge test failure OPM
Disable battery audit.
Use log PES117 to
determine which battery
string fails test.
Open the circuit to
the failed battery
string.
297-8361-550 Standard 04.01 September 2000
Proceed to OPM
site test.
This flowchart summarizes the
procedure.
Use the instructions that follow
this flowchart to perform the
procedure.
End of procedure.

Advertisement

Table of Contents
loading

Table of Contents