Nortel DMS-100 Series Maintenance Manual page 217

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

and press the Enter key.
where
site
is the site name of the OPM (alphanumeric)
frame
is the frame number of the OPM cabinet
lcm
is the number of the LCM
Note: The display on the right of the MTCE flag of the two units reads
SYSTEM RECOVERY. Monitor the recovery until the two units are
in-service.
If system recovery
passes
fails
10
To busy the LCM , type
>BSY PM
and press the Enter key.
11
To load the LCM, type
>LOADPM PM CC
and press the Enter key.
If the load
passes
fails
12
To return the LCM to service, type
>RTS PM
and press the Enter key.
If the LCM
returns to service
fails to return to service
13
To display the peripheral-side (P-side) peripherals, type
>TRNSL P
and press the Enter key.
14
To post the remote maintenance module (RMM) on the P-side of the LCM,
type
>POST RMM rmm_no
DMS-100 Family OPM Maintenance Manual XPM14 and up
The OPM recovery procedures
OPM
Do
step 13
step 10
Do
step 12
step 22
Do
step 13
step 22
6-5
(continued)

Advertisement

Table of Contents
loading

Table of Contents