Nortel DMS-100 Series Maintenance Manual page 606

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

13-4 OPM routine maintenance procedures
Battery capacity tests
OPM
(continued)
Battery capacity tests in OPM
At your present location
1
At the MAP terminal
2
3
4
5
6
297-8361-550 Standard 04.01 September 2000
Make sure that extended power failures did not occur at the OPM site in the
last 72 hours. Verify that the OPM is not in post ac failure recovery mode.
To access the OPMPES MAP display level, type
>MAPCI;MTC;PM;PES
and press the Enter key.
To post the appropriate alarm state, type
>POST
alarm_state
and press the Enter key.
where
alarm_state
is GREEN, AMBER, RED or OFFL
Note: If required use the NEXT command to scroll through the post set to
the appropriate PES.
To disable the automatic battery rotation and testing, type
>AUDIT DISABLE
and press the Enter key.
To open battery string pairs 0 and 4, type
>OPENCKT 0
and press the Enter key.
where
0
is the battery string pair 0 and 4
To open battery string pairs 1 and 5, type
>OPENCKT 1
and press the Enter key.
where
1
is the battery string pair 1 and 5

Advertisement

Table of Contents
loading

Table of Contents