13-8 OPM routine maintenance procedures
Battery capacity tests
OPM
(continued)
11
12
At the MAP terminal
13
14
15
16
17
297-8361-550 Standard 04.01 September 2000
If measured voltage
is greater than 49 V
Disconnect the battery string immediately. If you do not disconnect the
battery string immediately the batteries can crack before you install new
battery strings. Refer to the battery replacement procedure to replace the
pair of batteries as soon as possible.
Continue this procedure based on the battery strings tested.
If the strings tested
are 0, 1, 4, and 5
are 2, 3, 6, and 7
To return battery string pairs 0 and 4 to the load bus, type
>LOADB
0
and press the Enter key.
where
0
is the battery string pair 0 and 4
To return battery string pairs 1 and 5 to the load bus, type
>LOADB
1
and press the Enter key.
where
1
is the battery string pair 1 and 5
Go to step 8.
To return battery strings 2 and 6 to the load bus, type
>LOADB
2
and press the Enter key.
where
2
is the string pair 2 and 6
To return battery strings 3 and 7 to the load bus, type
>LOADB
3
and press the Enter key.
where
Do
step 12
Do
step 13
step 16