Nortel DMS-100 Series Maintenance Manual page 59

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

Table 7 OPM battery rotation and test cycle
W
k
Sunday
Monday
ST2
O/C ST2
for 24 hr
MEAS
ST2
CHG
ST2
O/C ST2
MEAS
ST2
4
MEAS
ST3
MEAS
DISCHG
ALL
ST3
O/C ST3
for 24 hr
MEAS
ST3
CHG
ST3
O/C ST3
MEAS
ST3
For each battery string pair, the rotation cycle provides a charge cycle one time
in a one-week interval. A test-and-charge cycle occurs one time in a four-week
interval. This cycle occurs for a different battery string pair each week. This
action occurs to test all pairs one time in a four-week interval. Less than four
battery strings can contain datafill for an OPM. If this condition occurs,
battery rotation activity does not occur during periods that are reserved. These
periods are reserved for the strings not datafilled.
Test-and-charge cycle description
The test-and-charge cycle detects battery strings that fail to hold enough
charge and require replacement.
Tuesday
Wednesday
ST2
MEAS ST3
CHG ST3
O/C ST3
LOADBUS
ST3
MEAS ST0
CHG ST0
O/C ST0
DMS-100 Family OPM Maintenance Manual ISN07 (TDM)/SN07 (DMS) and up
Thursday
ST3
ST0
MEAS ST0
MEAS ST1
CHG ST0
CHG ST1
O/C ST0
O/C ST1
LOADBUS
LOADBUS
ST0
ST2
MEAS ST1
MEAS ST2
CHG ST1
CHG ST2
O/C ST1
O/C ST2
OPM maintenance summary 1-43
Friday
ST1
MEAS ST2
CHG ST2
O/C ST2
LOADBUS
ST2
MEAS ST3
CHG ST3
O/C ST3
Saturday
ST2
LOADBUS
ST3

Advertisement

Table of Contents
loading

Table of Contents