Failure Of Post Charge Test Opm - Nortel DMS-100 Series Maintenance Manual

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

13-38 OPM routine maintenance procedures
Failure of post charge test
OPM
Application
Use this procedure after the failure of a post charge test to determine if the
replacement of batteries are necessary.
Interval
Perform this procedure after each post charge test failure.
Common procedures
There are no common procedures.
Action
This procedure contains a summary flowchart as an overview of the procedure.
Follow the appropriate steps to perform this procedure.
297-8361-550 Standard 04.01 September 2000

Advertisement

Table of Contents
loading

Table of Contents