Nortel DMS-100 Series Maintenance Manual page 594

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

12-2 Advanced troubleshooting procedures
4. List the peripheral module (PM) loads at the input-output (I/O) device
5. Use the LOADPM command to load the OPM.
6. Test the OPM.
7. Return the OPM to service.
8. This procedure is complete.
297-8361-550 Standard 04.01 September 2000
power, the circuit breaker stays in the ON position. If a problem occurs
with the power, the circuit returns to the OFF position.
a. Repeat steps Item 2, "At the remote site, set the switch on the power
converter to the ON position." on page 12-1 and Item 3, "Hold in the
reset button on the power converter, and flip the appropriate circuit
breaker up. Do not hold the circuit breaker up. If the OPM receives
power, the circuit breaker stays in the ON position. If a problem
occurs with the power, the circuit returns to the OFF position." on
page 12-1 for the other LCM unit.
b. Busy both LCM units.
used to return the units to service. List the PM loads at the I/O if you did
not perform this action during the power-up. To list the PM loads, type
>DSKUT;LISTVOL volume name ALL
and press the Enter key.
If you load from a DMS Supernode, type
>DISKUT;LV CM;LF volume name
and press the Enter key.
where
volume name
is the volume where the PM loads occur
Note: List the PM loads one time only.

Advertisement

Table of Contents
loading

Table of Contents