Nortel DMS-100 Series Maintenance Manual page 308

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

7-88 OPM alarm clearing procedures
LCM
minor
(continued)
18
19
20
21
297-8361-550 Standard 04.01 September 2000
To busy the RMM or ESA processor, type
>BSY
and press the Enter key.
To test the RMM or ESA processor, type
>TST
and press the Enter key.
If test
passed
failed, and the system produces
a card list
failed, but the system does not
produce a card list
To return to service the RMM or ESA processor, type
>RTS
and press the Enter key.
If RTS
passed
failed
To post the OPM with the alarm condition, type
>POST LCM site frame lcm
and press the Enter key.
where
site
is the site name of the OPM (alphanumeric)
frame
is the frame number of the OPM (0 to 511)
lcm
is the number of the LCM
Do
step 20
step 29
step 30
Do
step 32
step 30

Advertisement

Table of Contents
loading

Table of Contents