Nortel DMS-100 Series Maintenance Manual page 234

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

7-14 OPM alarm clearing procedures
LCM
critical
(end)
38
39
40
297-8361-550 Standard 04.01 September 2000
where
lcm_unit
is the LCM unit of the OPM to be loaded (0 or 1)
If load
is successful
is not successful
To test the LCM unit, type:
>TST UNIT lcm_unit
and press the Enter key.
where
lcm_unit
is the LCM unit of the OPM to be tested (0 or 1)
If test
passed
failed, and the system generated
a card list
failed, but the system did not
generate a card list
To attempt to return the LCM unit to service, type:
>RTS UNIT lcm_unit
and press the Enter key.
where
lcm_unit
is the LCM unit of the OPM to return to service (0 or 1)
If RTS
passed
failed
The procedure is complete.
Proceed to the correct procedure to clear an alarm if additional alarms
appear.
Do
step 38
step 33
Do
step 39
step 29
step 33
Do
step 40
step 33

Advertisement

Table of Contents
loading

Table of Contents