13-26 OPM routine maintenance procedures
Door alarms testing
OPM
(continued)
Testing door alarms in an OPM
At the OPM cabinet
1
2
3
4
297-8361-550 Standard 04.01 September 2000
Open the front and side doors.
Set up a telephone link with personnel in the host office at a MAP terminal.
Use the telephone link to monitor the alarms this procedure generates. Make
sure that the procedure generates a door alarm at the MAP terminal.
Example of a MAP display:
CM
MS
IOD
.
.
.
OPMPES
0 Quit
PM
2 Post_
3
4
OPMPES
5
6 Tst_
OPMPES
7 Bsy_
8 Rts_
Common
9 OffL_
AC
10
.
11 Disp_
BCC
12 Next
0= .
13
1= .
14 QueryPES
15 OpenCkt_
16 Charge_
17 LoadB_
18 MEASure_
Make sure that the procedure generates a door alarm at the MAP terminal.
If the door alarm at the MAP ter-
minal
generates
does not generate
Press the door switch and check the cancelation of the door alarm. Refer to
the following figure.
NET
PM
CCS
.
1PES
.
SysB
ManB
OffL
0
3
4
RED
AMBER
1
0
2 Cond:
RED
REM1
Rectifiers
FL0 FL1 CL0 CL1
BCCDVR
.
.
.
.
.
0
1
2
3
Temp
.
.
.
EHT ELT
.
.
.
O
Do
step 4
step 6
LNS
Trks
Ext
.
.
.
CBSY
ISTB
InSV
0
4
30
GREEN
OFFL
3
1
01
0
RMM
3
Audit
Week
HBT
.
2
.
PESALRM
ECU FSP
.
.
.
Door
FRNT SIDE
O
.
.
Indicates open doors
.
BCCFUSES
0
1