Nortel DMS-100 Series Maintenance Manual page 228

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

7-8 OPM alarm clearing procedures
LCM
critical
(continued)
12
13
14
15
297-8361-550 Standard 04.01 September 2000
where
link_no
is the number of a P-side link identified in step 10
To test the busied link, type:
>TST LINK link_no
and press the Enter key.
where
link_no
is the number of a P-side link busied in step 11
If test
passed
failed
To return to service (RTS) the busied link, type:
>RTS LINK link_no
and press the Enter key.
where
link_no
is the number of a P-side link tested in step 12
If RTS
passed and no other links are
system busy (SysB)
passed but other links are SysB
failed
To post the OPM noted in step 7 with the alarm condition, type:
>POST LCM site frame lcm
and press the Enter key.
where
site
is the site name of the OPM (alphanumeric)
frame
is the frame number of the OPM (0 to 511)
lcm
is the number of the LCM unit of the OPM
To busy both LCM units of the OPM, type:
>BSY PM
Do
step 13
step 33
Do
step 14
step 11
step 33

Advertisement

Table of Contents
loading

Table of Contents