2-66 Functional overview
Figure 17 SREX system dependencies
IPL
Register
LCM
SREX database
LCM objects
The converter voltage and ring test sections of LCM_REX_TEST require wait
states and unique test resources. These limits cause delays in SREX main task
execution that are not acceptable. The LCMCOV_REX_TEST implements
these tests separately from the LCM_REX_TEST. The
LCMCOV_REX_TEST runs at a lower priority. The LCMCOV_REX_TEST
requires logical test unit (LTU) connections in the maintenance line card. An
LCM unit can only access the single LTU when the other unit is out of service.
This resource limit does not allow LCMCOV_REX_TEST to execute at the
same time. The entry of the PARALLEL execution field for
LCMCOV_REX_TEST allows a maximum of one LCMCOV_REX_TEST
execution. Enter the PARALLEL field in table REXSCHED.
297-8361-550 Standard 04.02 December 2004
LCM REX
LCM
SREX
Aspect
Gates
SREX controller
Table OFCVAR
NODEREXCONTROL
LCM TC
LCM
Objects
Table REXSCHED
LCMMTC
LCM CI
Manual
TST REX
LCM_REX_TEST