Battery Capacity Tests Opm - Nortel DMS-100 Series Maintenance Manual

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

13-2 OPM routine maintenance procedures
Battery capacity tests
OPM
Application
Use this procedure to check the capacity of Yuasa (A037761) or Eagle-Picher
(A0386201) batteries. Use this procedure to check the capacity of Yuasa or
Eagle-Picher battteries in OPMs that have a line test unit (LTU) or multiline
test unit (MTU).
Interval
Perform this procedure every six months when LTU or MTU measurements
comply to specifications. Perform this procedure every 3 months if the LTU
or MTU measurements are not in specified limits. Do not perform this
procedure at the same time as the automatic battery testing.
Common procedures
There are no common procedures.
Action
This procedure contains a summary flowchart as an overview of the procedure.
Use the steps that follow the flowchart to perform this procedure.
297-8361-550 Standard 04.01 September 2000

Advertisement

Table of Contents
loading

Table of Contents