ABB IRB 2600ID Product Manual page 298

Table of Contents

Advertisement

4 Repair
4.6.2 Replacing the base
Continued
4
5
6
7
8
Continues on next page
298
Action
Drain the axis-1 gearbox.
Note
Draining is time-consuming.
Elapsed time varies depending on the tem-
perature of the oil.
Remove the cable harness in the base, the
frame and the lower arm of the robot.
Tip
Wrap up the cabling against the frame to
keep it undamaged during the remaining
work.
Secure the robot with roundslings in an
overhead crane.
Stretch the roundslings so that the robot
weight is secured when removing founda-
tion bolts in next step.
CAUTION
The IRB 2600/IRB 2600 ID robot weighs 280
kg.
All lifting accessories used must be sized
accordingly!
Remove the bolts that secure the robot to
the foundation.
© Copyright 2009-2023 ABB. All rights reserved.
Note
How to drain oil is detailed in section
Changing the oil, axis 1 gearbox on
floor mounted robots on page 153
How to remove the cable harness in base
and frame is detailed in sections:
Removing cable harness in base
on page 203
Removing cable harness in frame
on page 208
Removing cable harness in lower
arm and armhouse on page 209
Dimensions are specified in
equipment on page
296.
A
xx1800001211
A Roundsling 1.5 m
B Roundsling 2 m
Product manual - IRB 2600
3HAC035504-001 Revision: AD
Required
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 2600

Table of Contents