ABB IRB 2600ID Product Manual page 12

Table of Contents

Advertisement

Overview of this manual
Continued
Revision
C
Continues on next page
12
Description
Added section
Setting the system parameters for a suspended or tilted
robot on page
61.
Corrected spare part numbers for axes 3, 4, 5 and 6 motors. See Upper
arm and Upper arm ID.
Added VK covers to the instruction for upper arm cabling replacement,
IRB 2600ID. See
Replacing the cable harness in the upper arm - IRB
2600ID on page
227.
Changed information about which attachment screws to remove when
removing the base from the robot. Previously the instruction said "Re-
move the attachment screws securing the gearbox to the frame", now
it says "Remove the attachment screws that secure the base to the axis
1 gearbox". See step in the end of the removal procedure in section
Replacing the base on page
Changed information about the robot position when removing motor.
See
Removing motors on page
Added step about removing/refitting axis 1 motor when replacing the
axis 1 gearbox. Also added information about guide pins. See
gearbox axis 1 on page
of gearbox and motor, in all such instructions.
Added information about lifting accessories and how to attach them to
the upper arm of the robot, see
upper arm on page
Additional information in the procedure for replacing the base with im-
proved lifting instruction etc., see
Added a second roundsling to the lifting instruction for the complet robot,
see
Lifting robot with roundslings on page
Changed type of oil in axes 1, 2 and 4 gearboxes. See
in gearboxes on page
The following updates and changes have been made in this revision:
Added instructions for how to measure the play of axis 5 and 6 of an ID
upper arm. See sections
page 278
and
Required equipment on page
Deleted the spare part number for harnesses in Spare parts - lower arm
and instead inserted a reference to the Electrical connections.
Corrected the spare part numbers for cable harnesses, see Electrical
connections.
Corrected measurement that belong to figure xx0300000187, when fitting
tools for measuring the play of axis 5, see
on page
274.
Corrected faulty information about attachment screws between upper
and lower arm (figure, screw dimension and tightening torque), see
Replacing the complete upper arm on page
Added information about releasing the motor brakes in order to set the
weight of different axes onto lifting accessories, see
complete upper arm on page
and
Replacing gearbox axis 2 on page
Changed the instruction for how to replace the axes 2 and 3 gearboxes
without having to remove the cable harness, see
axis 3 on page 390
Added safety information about preventing roundslings from sliding
when lifting the upper arm tube, see
unit on page
260.
Added information about removing painting, if any, from assembly sur-
faces when replacing gearboxes and motors.
Corrected the specified weight for the tubular shaft unit to 30 kg.
Added tip to speed up the draining of axis 4 gearbox, see
oil, axis-4 gearbox on page
© Copyright 2009-2023 ABB. All rights reserved.
295.
307.
364. Also minor additions concerning the mating
Attaching the lifting accessories to the
255.
Replacing the base on page
57.
151.
Measuring the play, axis 5 (ID upper arm) on
281.
Measuring the play, axis 5
250.
250,
Replacing gearbox axis 3 on page 390
377.
and
Replacing gearbox axis 2 on page
Replacing complete tubular shaft
174.
Product manual - IRB 2600
3HAC035504-001 Revision: AD
Replacing
295.
Type of lubrication
Replacing the
Replacing gearbox
377.
Changing the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 2600

Table of Contents