ABB IRB 2600ID Product Manual page 264

Table of Contents

Advertisement

4 Repair
4.4.2 Replacing complete tubular shaft unit
Continued
2
3
4
5
6
Continues on next page
264
Action
Remove residues of old Loctite and other
contaminations from the assembly surfaces.
Remove any painting from the assembly
surfaces, with a knife.
Apply sealing liquid (Loctite 574) on the
surface between the tubular shaft unit and
the armhouse.
Make sure to apply the sealing liquid in
circles around each of the attachment holes.
CAUTION
The robot arm tube weighs 30 kg.
All lifting accessories used must be sized
accordingly!
Secure the tubular shaft unit with a round-
sling in an overhead crane.
CAUTION
Prevent the slings from sliding!
For example a small plate can be fitted to
the lower attachment hole for the cable
bracket (removed in a previous step). The
plate should be fitted so it points down-
wards and functions as a mechanical stop
for the roundsling.
At the other end of the tubular shaft unit, a
shackle can be fitted if the wrist unit is re-
moved.
Fit guide pins in the upper arm house.
© Copyright 2009-2023 ABB. All rights reserved.
Note
D
xx0800000457
Parts:
A Armhouse
B Surface where Loctite 574 shall be
applied
C Tubular shaft unit
D Cylindrical pin (2 pcs)
Specified in
Required equipment on
page
260.
Product manual - IRB 2600
3HAC035504-001 Revision: AD
A
B
C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 2600

Table of Contents