Test Operations; Test Operation Procedures - YASKAWA DX100 Operator's Manual

For material handling, press tending, cutting, and other applications
Hide thumbs Also See for DX100:
Table of Contents

Advertisement

155507-1CD
DX100
3.8

3.8.1 Test Operation Procedures

3
Teaching

3.8 Test Operations

Test Operations
Playback operations can be simulated in the teach mode with test
operations. This function is convenient for checking continuous paths and
operation instructions.
Test operation differs in the following ways from actual playback in the
play mode.
• Operation speeds greater than the maximum teaching
speed are reduced to the maximum teaching speed.
• Only machine lock is available among special operations
NOTE
for playback in the play mode.
• Work instruction output, such as arc output, is not
executed.
Test operation is performed by pressing [INTERLOCK] and [TEST
START]. For safety purposes, these keys will only function while the keys
are held down.
1. Select {JOB} under the main menu.
2. Press {JOB}.
– The test operation JOB CONTENT window appears.
3. Press [INTERLOCK] + [TEST START].
– The manipulator starts the test cycle operation.
– The manipulator moves only while these keys are held down.
However, after the operation starts, the motion continues even if
[INTERLOCK] is released.
– The manipulator stops immediately when [TEST START] is
released.
Always check safety conditions before starting the
NOTE
manipulator in motion.
3-70
153 of 554
RE-CSO-A037

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents