ABB Robotics IRB 1520 Product Manual page 184

Table of Contents

Advertisement

4 Repair
4.4.1 Replacing the complete upper arm, IRB 1520ID
Continued
Required equipment
Equipment
Upper arm, spare
Standard toolkit
Removing the complete upper arm
Use this procedure to remove the complete upper arm.
1
2
3
4
Continues on next page
184
Art. no.
For spare part number, see:
-
Action
Jog the axis 3 to -90°.
Drain the axis 3 gearbox.
Jog the robot to the synchronization position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot work-
ing area.
© Copyright 2012-2020 ABB. All rights reserved.
Spare parts on page
301.
Note
See
Changing the oil, axis-3 gearbox on
page
117.
xx1100000348
Note
Includes the wrist unit. All
gearboxes are filled with oil at
delivery.
Content is defined in section
Standard tools on page
297.
Product manual - IRB 1520
3HAC043435-001 Revision: L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents